It's cleaned out, and the countertops are removed. The sink and stove are stored at the moment, and the hoses and water reservoir are removed for cleaning or replacing as needed. I checked the propane lines, and they are in good shape. Hopefully I can just replace the regulator, and be in business, there.
I cut out new countertops using 1/2 inch finish grade plywood, using the old countertops for a pattern. I found a 4' x 4' piece of plywood at the hardware store that they had marked as scrap, and got it for $3.75, so the countertops came out pretty cheap.
Another trip to the hardware store is likely today, so I can pick up paint( Im going to look in their 'oops' paints, to see if they have a color I can stomach for cheap), water lines, a propane regulator, and various screws.
It's coming along.